| Re: comments on -08 base draft and .11binding-05 draft | <– Date –> <– Thread –> |
|
From: Pat Calhoun (pacalhou) (pcalhoun |
|
| Date: Tue, 18 Dec 2007 16:44:20 -0800 (PST) | |
> 1) In section 4.3 of -08 draft, the "Wireless Specific Information"
optional field has an 8-bit "Wireless ID" field.
> There is a similar 5 bit WBID field in the main capwap header (in the
first 32 bits). Are the two same? If the two are > the same, then we
should delete the "Wireless ID" in the "Wireless Specific Information"
optional header.
Yes, I agree with this change.
> 2) The "Wireless Specific Information" field for .11 is described in
section 4 of the -05 .11 binding spec. Does the
> text in section 4 "IEEE 802.11 Frame Info" describe the "data" part of
the "Wireless Specific Information" in the base
> spec? If so, then we should clarify this in the -05 .11 spec.
Yes, I agree with this change.
> 3) The base spec requires that the optional elements be 4 byte
aligned. The "Wireless Specific Information" field has 2
> bytes of "Wireless ID" + "Length which means that the "Data" part
should be 2, 6, 10 etc in length. However the .11
> spec only defines a 4 byte "Data" part (see 2 above) which does not
meet the alignment requirements. We should change
> the .11 binding spec and make the "Data" 6 bytes in length with the
last 2 bytes being reserved.
The CAPWAP spec already makes this very clear. Specifically, section 4.3
states:
" Wireless Specific Information: This optional field contains
technology specific information that may be used to carry per
packet wireless information. This field is only present if the
'W' bit is set. The HLEN field assumes 4 byte alignment, and this
field MUST be padded with zeroes (0x00) if it is not 4 byte
aligned."
So I do not believe any additional changes are needed to address this.
Anyone disagree with the above?
PatC
-
comments on -08 base draft and .11binding-05 draft Puneet Agarwal, December 14 2007
- Re: comments on -08 base draft and .11binding-05 draft Pat Calhoun (pacalhou), December 16 2007
- Re: comments on -08 base draft and .11binding-05 draft Pat Calhoun (pacalhou), December 18 2007
-
Re: comments on -08 base draft and .11binding-05 draft Puneet Agarwal, December 18 2007
- Re: comments on -08 base draft and .11binding-05 draft Pat Calhoun (pacalhou), December 19 2007
- Re: comments on -08 base draft and .11binding-05 draft Puneet Agarwal, December 19 2007
- Re: comments on -08 base draft and .11binding-05 draft Abhijit Choudhury (achoudhu), December 19 2007
Results generated by Tiger Technologies using MHonArc.